Construction Updates
Nashua - Merrimack - Bedford 13761
Project 13761A
F. E. Everett Turnpike (FEET) NB and SB between 8 (Somerset Parkway) and Exit 10 (Industrial Drive)
This project will widen the Turnpike from two to three lanes in each direction. The construction work includes pavement widening and reconstruction, replacement of the bridges over Pennichuck Brook, median rehabilitation, overhead sign structure replacements, inclusion of ITS infrastructure, construction of stormwater quality treatment facilities, and the removal of the tunnel located under the FEET at Exit 10. Project completion is scheduled for May 2028.
Recent Activities (as of early August 2026)
Southbound
- Construction of Drainage Basin 871 is nearing completion, and the installation of the low permeability fill is done.
Northbound
- Fine grading and preparing for pavement for the approach and departure from the bridge is underway.
Exit 10
- Minimal work is expected in this area.
Pennichuck Brook Bridge
- Phase 2 concrete approach slabs and sleeper slabs have been constructed.
Upcoming Work (August 2026 to September 2026)
Southbound
- Completion of Drainage Basin 871.
Northbound
- Fine grading and preparing for pavement for the approach and departure from the bridge will be completed.
- Paving the crossovers needed for the next phase of construction.
- Shifting traffic to Phase 4 configuration will occur late August or early September.
Exit 10
- Minimal work is expected in this area.
Pennichuck Brook Bridge
- The bridge deck will have the membrane and pavement placed.
General Traffic Implications
Summer 2026
- Rolling roadblocks, shoulder closures and night work, as needed, for temporary roadwork, as traffic allows.